New complex building and dormitory building of Qifa Vocational Education Center in Lixian County, Baoding City
Project time November 2023, location is Li County, Baoding City.
Uranus ASH-180CHW-VDS 12 sets; Uranus ASH-150CHW-VDS 6 sets, Uranus ASH-90CHW-VDS 1 set.
The project is located in Lixian County, Baoding City, and inspired the vocational and technical school cooling and heating project, using decentralized. installation, saving power distribution, because of the use of commercial inverter units, it is a high-quality BOT operation project.
Two Aokla 10HP variable frequency ultra-low temperature air energy main units and 14 500L closed pressure water tanks are used to meet the daily hot water supply of 20T.
Application of 12 sets of 60P ultra-low temperature inverter air source heat pump (chilled water) air-conditioning units of Auclean.
Meet the cooling and heating demand of 19,000 square metres of building area.
Application of 4 sets of 50P ultra-low temperature inverter air source heat pump (chilled water) air conditioning units from Auclean.
Satisfy the cooling and heating demand of 5500 square meters.
Application of 2 sets of 30P ultra-low temperature inverter air source heat pump (chilled water) air-conditioning units of Auclean.
To meet the cooling and heating demand of 1700 square meters of building area.
Applying 16 sets of 60P and 3 sets of 30P ultra-low temperature inverter air source heat pump (chilled water) air conditioning units from Auclean.
To meet the heating needs of five heating sites, including the Party Center, kindergarten, police station, administrative office building and Xikuer Town Central Primary School, with a total floor area of about 32,000 square meters, in Xikuer Town.