Northern China Central China Northwest Eastern China Central South China Southwestern Northwestern
  • Baoding Lixian Qifa Vocational Education Center Project

    New complex building and dormitory building of Qifa Vocational Education Center in Lixian County, Baoding City

  • Baoding Li County Inspired Vocational and Technical School Heating and Cooling BOT Project

    Project time November 2023, location is Li County, Baoding City.

    Uranus ASH-180CHW-VDS 12 sets; Uranus ASH-150CHW-VDS 6 sets, Uranus ASH-90CHW-VDS 1 set.

    The project is located in Lixian County, Baoding City, and inspired the vocational and technical school cooling and heating project, using decentralized. installation, saving power distribution, because of the use of commercial inverter units, it is a high-quality BOT operation project.

  • Zhengzhou Medical College Ward Building Closed Central Hot Water Project

    Two Aokla 10HP variable frequency ultra-low temperature air energy main units and 14 500L closed pressure water tanks are used to meet the daily hot water supply of 20T.

  • Air Conditioning Unit Project for New Office Building of Public Security Bureau of Atushi City, Kexu, Xinjiang

    Application of 12 sets of 60P ultra-low temperature inverter air source heat pump (chilled water) air-conditioning units of Auclean.

    Meet the cooling and heating demand of 19,000 square metres of building area.

  • Xinjiang Aksu Fire Brigade Office Area Coal to Electricity Centralized Heating Renovation Project

    Application of 4 sets of 50P ultra-low temperature inverter air source heat pump (chilled water) air conditioning units from Auclean.

    Satisfy the cooling and heating demand of 5500 square meters.

  • Low-temperature air source heat pump air-conditioning unit project for the administrative office area of the new broadcasting and television tower in the ancient city of Kashgar, Xinjiang Province

    Application of 2 sets of 30P ultra-low temperature inverter air source heat pump (chilled water) air-conditioning units of Auclean.

    To meet the cooling and heating demand of 1700 square meters of building area.

  • Centralized Heating Project in Xikelkul Township, Gashi County, Kashgar City, Xinjiang, Administrative Division Adjustment (Relocation) and Local Reconstruction

    Applying 16 sets of 60P and 3 sets of 30P ultra-low temperature inverter air source heat pump (chilled water) air conditioning units from Auclean.

    To meet the heating needs of five heating sites, including the Party Center, kindergarten, police station, administrative office building and Xikuer Town Central Primary School, with a total floor area of about 32,000 square meters, in Xikuer Town.